Tuesday, February 4, 2014

Before and Afters Part 2

Annnnnd 3 months later, I finally get myself to show you the rest of the apartment...

The bathroom was deceiving to the untrained eye. It had been remodeled within the last 5 years previous to me buying the house. However, none of the underlying issues had been fixed, i.e. leaky pipes and around the tub area. And the workmanship on the install of finishes was abysmal. No one tile aligned with any other on the floor or on the wall. And it was dirty brown beige. All plumbing fixtures were the cheapest you could get and thus the sink faucet was always leaking, and there was a particularly dramatic evening I spent in the closet installing a new shower kit, including multiple trips to Home Depot, and a mental breakdown while sitting on the floor next to a dirty litter box. Also the electrical was a mess, fairly dangerous, and made no sense. And the toilet seat was the wrong size. And brown vinyl base. I mean, come onnnnnn.


Yucky.

Pretty!

I am particularly proud of the radiator cover and built-in wall on the left, I wish I had a better picture to show you all. It came out exactly like the rendering I had done of it.


No more Glacier Bay piece of crap plastic valves and handles! Also all the tiling is done correctly...



So what did we do? All new electrical, rebuilt the control wall in the tub, fully waterproofed the shower area, new tile on the walls, removed several layers of tile flooring and installed new hex tile, added a built-in for storage, replaced missing trim, installed a new fan/light combo, painted the existing vanity lighting fixture black, cleaned the sink vanity, repainted the medicine cabinet, and added a new sink faucet and plumbing. And new paint on all trim and walls (after much scraping and caulking). And a properly size toilet seat, which surprisingly really helped de-ghetto the room.

Best of all because all labor was free (me!), this was all done for less than $400 dollars. The electrician oversaw and inspected the work I did in here as he was doing some last minute outlet & light box changes in the other rooms. Granted, there was a lot of terrible work, and getting very tired of being in the "cell", but in the end, it was so worth it.


Monday, August 19, 2013

Before and Afters Part 1

So I've finished the renovation and rented the place out. I've rested. Now it's time for everyone's favorite, Before and After.  I might fill in with another post about more progress, but this is what we're all here for, let's not kid ourselves.


Let's start with the Sunroom. 

In here, we had bubbling trim paint, no window coverings, one of those ugly square tray light fixtures, and overall sadness.



So I'm not sure why the bamboo roman shades look see-thru? They're not, I promise. What you can't see is that I painted a gold boob light (from my bedroom) black and installed it in here.  Still not my favorite light fixture, but it looks 1,000 times better, and it was free.

Living Room & Dining Room 

The gold fireplace, dingy ceiling tiles, and dirt (?) (hopefully?) smears on the walls were doing these rooms no favors. (So ok, my 2 second photoshop isn't helping either).  The crown molding had large gaps at the ceiling interface that made it seem like it was about to fall down. Fortunately, caulk has been invented, and was used in Costco-sized amounts.




While I did not get around to painting the ceiling fans, once everything else was done, the gold was not so offensive. Or maybe I was just tired. Meh. They did get new matching pull chains, because the mis-matched ones were giving me a panic attack.  That one little thing made a huge difference, at least to me.  Painting the ceiling tiles to make sure all the cracks were filled in was a pain in the arse, but now you really don't notice that they are tiled all that much. Thank god.  
New view into living room from the dining room


The white trim in the dining room really pops now with the light green on the walls. Due to the settling of the house, not one edge of this was flush against the walls. Mom to the rescue, she caulked every seam for me. It was an incredible improvement just after that alone.

Is that a SHOE LACE?! as a ceiling fan pull chain? Of course!


Drum Roll Please....

Kitchen!

For an extremely tight budget, about $300, I think the kitchen turned out pretty well. It was a horror show when I got my hands on it though, so being engulfed in flames would have actually been a step up. Filthy everything, a stained dropped ceiling, a ceiling fan?!, surface mounted electrical, upper cabinets crowding the windows, layers of vinyl flooring, and a leaking faucet. Gag.



Things that happened: The drop ceiling was torn down, and I put up new gyp board over the cracked and peeling plaster, regaining 6 inches of height. The light blocking upper cabinets were taken down and relocated to the back wall. The window wall got beadboard, new electrical, and a new black industrial/schoolhouse light fixture, adding much needed light over the sink. The ceiling fan was literally kicked to the curb and replaced with another black painted boob light. I installed a new Hansgrohe faucet that pulls out. It's about a million pounds, all brass, and very tenant proof. All the cabinets were scrubbed and painted Martha Stewart "Mushroom" in semi-gloss. Inside, I covered the bottom of the cabinets with peel and stick vinyl tiles, covering old water stains and making it much easier to clean. I used that new Rustoleum countertop paint to go over the blue laminate. It is now a glossy black, along with the hardware. The previously sad metal cabinet was painted to match the wood cabinets. It was only 18" deep, so I glued a 2x2 piece of birch plywood on top to give more depth to the counter. I stained the top with some random mixture of dark oil stains that I had, painted the edges black, and buffed the top with linseed and beeswax finish to make it waterproof.  Lastly, all the flooring was torn up, excepting the pantry, and the wood was refinished in here as well.
Remember this guy? He got a little facelift.

Someday there will be a new range and vented hood here.

 


Ironing board cabinet with doors removed. The plan had me putting shelves in here. Alas, I ran out of time.

Well that was lot. Let's save the other half of the house for the next post or else this is going to be the War and Peace of Before and Afters...

Wednesday, July 17, 2013

Evolution of the fireplace

The fireplace was deceptive. It looks kinda ok here, minus the giant gold doors that are totally ruining the proportions of it.
I've seen worse

 
Fun grime after removing doors


Yey clean!

 Because I couldn't leave well enough alone, and because I'm just wallowing in free extra time, I decided to paint the brick. It's scored brick, so it collects dirt and hair like crazy. I figured if it was painted, it would do less of that. So here we go:

First pass, just the brick faces. Interior and yucky sconces now pretty and black.

Did I forget to do those grout lines under the accent? Yes, yes I did.
And that's why paint fumes are bad for you kids.
Painting happened this weekend too. The two large rooms are done. Ceiling, trim, walls. Done. Everything in the place will be Behr's Turtle Dove on the walls. It's a light green that plays nicely with the pecan color of the floors. Also, green is soothing. Quiet tenants, quiet...

Floors bring hope. And dust.

The floors were sanded Monday and Tuesday of last week, and I oiled them Tuesday night. Having them done was HUGE and made me believe that at some point, this all might actually turn into something. They got up all the tar, just a little staining was left, but with the oil, it just kind of blends in so it's not that noticeable.
Before
During

Ghost feet!

After

Prep work baby

It would appear that after I removed all the flooring I proceeded to prep the walls for painting for 6 weeks. Or something. I can't tell you what I've been doing, but it's been frickin exhausting. It's 12 tubes of caulk later, and I still need to do the kitchen.

The dining room had this really exciting patch of plaster and paint that apparently had a terrible fight and the paint decided to take it's cat and sweater and GTFO, because it just sheeted off the wall. I'd think I was done, start to spackle, then notice a tiny crack, poke at it, then boom, another 2 square feet gone. 

Not frustrating at allllll. *Goes down to the basement for another beer*
Note too the crown moulding in here and in the living room that had to be scraped because whatever monkey painted it did not prep the varnish surface correctly. Color me not surprised. Anyway, it's all curvy and a bitch to handle. (Wait are we talking me or the wood here?!) So overall, I would go into a room and make it look one thousand times worse than the before. TA DA!
This is really nice Beth. I love what you've done with the place.

Eventually I did manage to make it to the priming stage, which to my horror, due to my supreme anal retentiveness, included priming each joint of the acoustical tile ceiling, all 900 square feet of it. The lines were brown and they looked awful and made it look like a motel in which you'd get murdered. Not the look I'm after.


What's this? Oh just 3 hours of my life I'll never get back.
Don't worry, the Biebs is still holding down the fort. Even he can't stand to look at the awful paint job on these built-ins. Glass knobs? Slobbed with paint. Because the ten seconds it takes to remove them it just TOO MUCH. Sigh.


Next up, I finally start to make it look livable in here. Thank goodness.

Thursday, July 11, 2013

Minor progress in the kitchen

The kitchen has been last on the list to get done because we were constantly in there making a mess with grout and concrete and whatnot. We did manage to put in the electric for the over the sink light, which will make it so much brighter in there.  Also rerouted the wiring for the outlets that had been in the gross surface-mounted conduit.

The wall is getting wainscoting, which is 2/3rds cut, thanks to my sister and her boyfriend.
Electrical that makes sense. Hooray!

Also, the cabinets are primed after another good scrub. The doors and drawers have gotten their first coat of paint as well, and the hardware is all painted black and looking fantastic.


I didn't hate the copper, but it was worn off in places and had some discoloring that would not come off despite my best cleaning job. The black definitely will look sharp (oh god, I'm turning into my father. WHO says that?!) against the cabinet color, Martha Stewart "Mushroom", mixed into Behr semi-gloss enamel. It's a medium gray with a hint of green. A good dirt hiding color...

Terrible cell phone picture, sorry. You get the idea.

Bathroom Progress

Tons of fun in the bathroom in the past month. First up, after demo'ing all the rotting wall structure on the control wall, it was rebuilt and a new valve for a single lever shower/bath faucet was installed - correctly, by securing it to framing, so that it does not jiggle in the wall every time you touch it, unlike my thighs. Framing anything in the house is challenging, considering all the settling, which means the walls, floors, ceilings are all at different angles. Good thing someone loves geometry!


I went with the same wall tile and pattern as my bathroom upstairs. I liked the way it looked and there was no need to re-invent the wheel. Besides, then I knew exactly how much tile to buy. Also, I scored a box and a half of the subway tile from Albany Historic Warehouse for 50% off retail, saving $60. Moral of the story - check local places like there or Habitat for Humanity's ReStore before jetting to big box stores for everything.
Tiling over Schluter waterproofing system in the shower. No more rot!
 And then there was the floor. 

Large beige/brown tile applied with mastic to backer board made of paper fiber (perfect for *wet* bathroom floors). 

Removal Level 1


Then 2 layers of linoleum glued over the original tile floors, which were broken and crumbling to due a cracked and disintegrating mud base. Perfect! Actually, it was as I had expected, so I wasn't too upset/concerned about it. After removing all the original tile (we were able to save half a 5 gallon bucket of them, either to donate or get crafty with) we then chipped/vacuumed away the failing parts of the floor.

A floor made of dust
 
A level floor at last!


After much filling in of cracks and waiting for concrete to dry, there was finally floor that didn't make me frown. I wanted a small field tile for the floor because the space is so small. It would also be easier to camouflage any remaining tilt in the floor. I ended up with 3/4" matte glazed hex, because that was the size in the overstock room at Best Tile. The tile was a little thin, which made it installing it a *bit* of a challenge, but it got done. We used the Schluter system for the floor as well, to reduce future cracking if/when more settling occurs.


We've since added in all the cut-in tile and grouted the floor, but I'm too lazy to download that picture right now. You'll just have to trust me that it looks good. Also, doesn't it look so spacious without the toilet and sink? Maybe I can just leave those out?